Westchester - Playa del Rey
Building permits in 90045
Los Angeles issued 214 permits in 90045, Westchester - Playa del Rey, between Aug 25, 2026 and Sep 12, 2026, including 10 worth more than $100,000.
- Permits issued
- 214
- on record
- Declared value
- $77.0M
- where the city states one
- Over $100k
- 10
- individual jobs
What kind of work
Priced by the city
- Bldg-Alter/Repair73 · $12.9M
- Bldg-Addition4 · $500k
- Grading3 · $2k
- Sign3 · $17k
- Nonbldg-New2 · $70k
- Swimming-Pool/Spa2 · $2k
- Nonbldg-Alter/Repair1 · $800k
- Bldg-New1 · $62.7M
Trade permits
- Electrical56
- Plumbing38
- HVAC19
- Fire Sprinkler9
- Elevator3
Los Angeles publishes no dollar value for electrical or mechanical permits, so these are counted but not priced.
The largest jobs in 90045
| Address | Type | Value | Issued |
|---|---|---|---|
| 6501 S SEPULVEDA BLVD 1-362 New 8-story type I-A & type III-A , mixed-use Apartment building with 362 Units . (4 levels of Type III-A apartments over 4 levels of Type I-A parking & apartments & ground floor parking & restaurant( core & shell space) over 1 level Type I-A parking basement. ((41 VLI = 11%) Utilizing 12.22.A.25 incentives.) | Bldg-New | $62,684,296 | Aug 31, 2026 |
| 100 WORLD WAY The scope of work for Bulletin 1 includes additional sidewalk reconstruction to mitigate ADA concerns, and sidewalk and crosswalk revisions at the Tom Bradley Terminal in coordination with the TBIT refresh project. | Bldg-Alter/Repair | $5,000,000 | Aug 26, 2026 |
| 380 WORLD WAY Level 5 **ePlan**LAX**TENANT IMPROVEMENT OFFICE BUILD-OUT OF SHELL SPACE INCLUDING OFFICES FOR AIRPORT POLICE (APD), SHARED OFFICES, DCMS LAB AND TSA 3D PRINTING INNOVATION OFFICES. INTERIOR TENANT IMPROVEMENT LIMITS TO LEVEL 5; WORK TO BE PERFORMED SHALL INCLUDE RECONFIGURING THE SPACE WITH NEW NON-LOAD BEARING PARTITION WALLS, ELECTRICAL, MECHANICAL AND PLUMBING, NEW CASEWORK AND TELECOM ALTERATIONS TO ACCOMMODATE NEW OFFICE. EXISTING CORE STRUCTURE ARE NOT PART OF THIS SCOPE AND SHALL REMAIN AS IS. NEW ROOF TOP EXHAUST UNITS REQUIRE NEW ROOF PENETRATIONS. DIGITAL WALL REQUIRES STRUCTURAL SUPPORT AND ANCHORING TO DECK. | Bldg-Alter/Repair | $4,000,000 | Sep 11, 2026 |
| 380 WORLD WAY TBIT Refresh - Package #2, Supplemental #1: This scope of work is part of the overall TBIT Refresh Project (Plan Check #B25LA48817 and #B25LA52462, respectively). The specific scope includes the construction of exterior entry portals at Levels 1 (Arrivals) and 3 (Departures). These portals are entirely at the exterior of the TBIT building, with the exception of portions of the support steel that tie into the existing building structure. Each portal will host a set of glazed automatic entry doors for public access to the terminal. This submittal includes only architectural and structural scope. | Bldg-Alter/Repair | $1,600,000 | Sep 10, 2026 |
| 200 WORLD WAY **ePlan**LAX**Early Start - Interior Demolition of Walls, Ceilings and Finishes inside Terminal 2 Sky Club Space. | Bldg-Alter/Repair | $812,000 | Aug 27, 2026 |
| 245 WORLD WAY N/A LAX PROJECT Attn: Farshad AlimohamadiPermit Number: 25020-10000-01817Subject: Revised Scope of WorkThis revision modifies the approved parking lot restoration scope to provide periodic maintenance vehicle access requested by LAWA and FAA. Work includes renovating the existing east curb cut, previously shown to be removed and replaced with curb, and adding an approximately 50-foot-wide manually operated bi-parting sliding gate within the parking lot perimeter fence.The revised gate and curb cut will allow controlled maintenance-only vehicle access. The site use remains unchanged as a slab-on-grade parking lot serving the FAA KLAX Tower. Parking stall count, general site function, and approved restoration scope remain unchanged except as shown in the revised drawings. All work shall comply with CBC, CalGreen, LADBS requirements, and other applicable codes and standards. | Nonbldg-Alter/Repair | $800,000 | Aug 26, 2026 |
| 380 WORLD WAY Water damage, termite damage/ dry rot repair less than 10% of replacement cost of residential buildings. | Bldg-Alter/Repair | $500,000 | Sep 11, 2026 |
| 7812 S BELAND AVE EPLAN 1st and 2nd floor addition to existing single-family dwelling NFPA-13D FULLY-SPRINKLERED | Bldg-Addition | $350,000 | Sep 3, 2026 |
| 5932 W CENTURY BLVD LAX project: This is a deferred submittal for the LAX United Cargo Optimization project (Permit#: 25016-10000-36833). The submittal consists of structural drawings and calculations for new 'Temperature Controlled ULD racking' (TC ULD) and new 'Empty AKE racking' that will be installed as part of the above permitted project. The included reference site plan shows the location of the two different storage racks on site. Anchorage for the new racking is included in the RTI set. | Bldg-Alter/Repair | $184,538 | Aug 31, 2026 |
| 380 WORLD WAY Tenatnt-space #4 **ePlan**LAX**Tom Bradley International Terminal - Interior Tenant improvement. No change in use (retail/mercantile use), no structural and no exterior work. | Bldg-Alter/Repair | $129,500 | Aug 26, 2026 |
| 9007 3/4-5/8 S RAMSGATE AVE ePlan:Existing Detached Garage Conversion into 2 ADUs W/ no addition. STATE ADU PER GC 66323(a)(1)Work per WFPP.AB2097 | Bldg-Alter/Repair | $85,000 | Aug 27, 2026 |
| 7518 S OGELSBY AVE New A.D.U. above (E) detached garage per LAMC 12.22A.33(b)(1). Design per engineer. | Bldg-Addition | $80,000 | Sep 4, 2026 |
| 9007 3/4-5/8 S RAMSGATE AVE SUPPLEMENTAL TO PERMIT#25016-10000-06927 TO REVISE THE BUILDING SUBTYPE FROMAPARTMENT TO SFD/DUPLEX AND CAPTURE MEP WORK. | Bldg-Alter/Repair | $61,000 | Sep 10, 2026 |
| 1 S LMU DR Eplan. Concrete service slab with CMU fence enclosing walls (open to sky) ancillary to the university's electrical infrastructure upgrade for safety purpose, to restrict public access to the new electrical equipment. | Nonbldg-New | $60,000 | Sep 10, 2026 |
| 6561 W 88TH ST EPLAN: Minor Modification to AT&T wireless facility located atop the Church steeple.Replace (9) panel antennas on existing steeple (some of them being relocated to different mounts);Replace (3) Radios behind steeple wall;Install (6) combiners behind steeple wall;Install ancillary equipment in the exsiting equipment area. | Bldg-Alter/Repair | $50,000 | Sep 2, 2026 |
| 6150 W CENTURY BLVD ePlan Supplemental permit to 19016-10000-26563 LAX APM, Alteration to existing Mercury Building for exterior structural bracing on one wall. | Bldg-Alter/Repair | $50,000 | Aug 25, 2026 |
| 6321 W 78TH PL Conversion of an (e) covered patio into habitable space in an (e) SFD. Replace window with new door at (e) bedroom. | Bldg-Addition | $45,000 | Sep 11, 2026 |
| 8301 S RAYFORD DR 12 window(s). Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2(b)1B.2 bathroom(s).Bathroom remodel for residential buildings (no structural changes).6 door(s). Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Title 24, Part 6, Section 150.2(b)1B.Kitchen remodel for residential buildings (no structural changes). | Bldg-Alter/Repair | $31,500 | Aug 25, 2026 |
| 5750 W CENTINELA AVE Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 144 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b)2B. | Bldg-Alter/Repair | $28,800 | Aug 27, 2026 |
| 5720 W CENTINELA AVE Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 144 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b)2B. | Bldg-Alter/Repair | $28,800 | Aug 27, 2026 |
Know about 90045's next permit the morning it is filed
This page is a snapshot, and Los Angeles publishes about nine days behind. Pulld watches 90045 and emails you every new permit matching your trade at 6am, so you are reading it before the owner has finished calling around.
Watch 90045 free for 14 daysSource: City of Los Angeles Department of Building and Safety, via the city's open data portal. The city does not warrant the completeness or accuracy of these records, and neither do we. All Los Angeles zip codes.